May 6, 2002
The Korean Peninsula Energy Development Organization (KEDO) is offering companies from KEDO Member Countries an opportunity to participate in the procurement of materials, components, and equipment for the construction of its Light Water Reactor Project in Kumho, North Korea.
This particular opportunity is for the supply of the X-Ray and Metal Detector system. Interested companies who possess the technical capability, production capacity, and financial stability to offer a competitively priced product are encouraged to respond. KEDO will review the responses from interested companies and compile a consolidated list of candidates. This list will be forwarded to Korea Electric Power Corporation (KEPCO), the Prime Contractor, with instructions to qualify these companies for inclusion in their Pool of Qualified Suppliers.
Any company interested, and who deems themselves capable of being qualified, in providing the X-Ray and Metal Detector system is encouraged to complete the enclosed brief corporate overview and return it with any additional relevant corporate information to KEDO before the close of business on June 7, 2002. A brief summary of the technical specification for this procurement is enclosed to assist companies in making a determination to participate.
Companies selected by KEDO to be considered for this procurement should receive a qualification package from KEPCO around mid August 2002.
If you have any questions regarding this opportunity, please feel free to contact Mr. Soon nam Jung at (212) 455-0207.
Sincerely,
John B. Mulligan
Director, Project Operations Division
SPEC NO:
|
9-159-M273
|
TITLE:
|
Flow Restriction Elements and Venturis
|
PROCUREMENT SOURCE:
|
OB QUALITY CLASS: Q, T, R, S
|
FORECASTED ITT ISSUE DATE:
|
March 15, 2003
|
FORECASTED CONTRACT AWARD DATE:
|
April 30, 2004
|
FORCASTED INITIAL SITE DELIVERY DATE:
|
March 31, 2005
|
DESCRIPTION:
|
a. Safety Category: Safety Related and Non-Safety Related
|
b. Relevant Codes and Standards (in effect as of December 31, 1996):
- ASME Section III
- ANSI/ASME B16.11
- ASME Pub [1971] "Fluid Meters"
- ASME B31.1
- ASME NQA-11
|
c. Scope of Supply (for two 1000 MWe units)
- Safety Related Flow Restriction Elements: 57 ea per unit (114 total)
- Safety Related Flow Measuring Orifices: 2 ea per unit (4 total)
- Safety Related Cavitating Venturis: 2 ea per unit (4 total)
- Non-Safety Related Flow Restriction Elements: 41 ea per unit (82 total)
- Non-Safety Related Venturis 1 ea per unit (2 total)
- Safety Related Dummy Orifices: 10 ea per two units (10 total)
- Non-Safety Related Flow Restriction Elements: 6 ea per two units (6 total)
|
d. Design Requirements
The major design parameter data of each item will be in the following ranges:
- Capacity (gpm) 40,000 0.16
- Inlet Pressure (psig) 3,000 18
- D P Permanent (psi) 1,767 1.22
Seismic Category I, II, III
The dynamic design requirements for the Design Basis Events shall be applied to the Seismic Category I, II items.
|
e. Technical Requirements
- Quality Assurance Program
- Design Report
|
1 Note: The extent to which the QA requirements are to be applied shall be consistent with the importance to nuclear safety of the item, service or process. A graded approach, which can satisfy the necessary requirements and ensure the required quality and safety,shall be used.
|
|
|
|
|
|
|