January 15, 2003

Subject: Opportunity to Participate in Hydrogen Recombiners, Package No. 9-443-N227

The Korean Peninsula Energy Development Organization (KEDO) is offering companies from KEDO Member Countries an opportunity to participate in the procurement of materials, components and equipment for the construction of its Light Water Reactor Project in Kumho, North Korea.

This particular opportunity is for the supply of hydrogen recombiners. Interested companies who possess the technical capability, production capacity, and financial stability to offer a competitively priced product are encouraged to respond. KEDO will review the responses from interested companies and compile a consolidated list of candidates. This list will be forwarded to Korea Electric Power Corporation (KEPCO), the Prime Contractor, with instructions to qualify these companies for inclusion in their Pool of Qualified Suppliers.

Any company interested, and who deems themselves capable of being qualified in providing hydrogen recombiners is encouraged to complete the enclosed brief corporate overview and return it with any additional relevant corporate information to KEDO before the close of business on February 15, 2003. A brief summary of the technical specification for this procurement is enclosed to assist companies in making a determination to participate.

This information is also posted on KEDO's Web Page at www.kedo.org.

Companies selected by KEDO to be considered for this procurement should receive a qualification package from KEPCO around early May 2003.

If you have any questions regarding this opportunity, please feel free to contact Mr. Soon nam Jung at (212) 455-0207.

Sincerely,


John B. Mulligan
Director, Project Operations Division






SPEC NO: 9-443-N227
TITLE: Hydrogen Recombiners
PROCUREMENT SOURCE: OB
QUALITY CLASS: Q
FORECASTED ITT ISSUE DATE: October 31, 2003
FORECASTED CONTRACT AWARD DATE: November 30, 2004
FORCASTED INITIAL SITE DELIVERY DATE: March 31, 2007
DESCRIPTION:
a. Safety Category: Safety Related
b. Relevant Codes and Standards (in effect as of December 31, 1996):
  • ASME Section III Div. 1
  • ASME QME-1
  • IEEE 323
  • ASME NQA-1¹
c. Scope of Supply (for two 1000 MWe units)
  • Hydrogen Recombiners 2 each/total

d. Design Requirements

  • Hydrogen recombiner
    - Rated Voltage (V): 480 ± 10%Frequency (Hz): 60Hz ± 5%
    - Operating Hydrogen Range (influent): 1.0v/o ~ 5.0 v/o
    - Effluent Hydrogen Concentration: less than 0.1 v/o
    - Capacity (SCFM): 70 (minimum)
  • Instrumentation and Control
    - Rated Voltage (V): 120V ± 10%
    - Frequency (Hz): 60 Hz ± 5%
e. Technical Requirements
  • QA Program Manual
  • Design Reports (ASME III)
  • Dynamic Qualification Report/ Environmental Qualification Report



¹ Note: The extent to which the QA requirements are to be applied shall be consistent with the importance to nuclear safety of the item, service or process. A graded approach, which can satisfy the necessary requirements and ensure the required quality and safety,shall be used.