KEDO Home Page
12/25/2024    1:48:23 PM
About Us Light Water Reactor Project Agreements & Protocols Nuclear Safety News KEDO Annual Reports

NO

SPEC./PKG.& NO

DESCRIPTION

1

C209

CONTAINMENT POST-TENSIONING SYSTEM

2

E201

345kV MAIN TRANSFORMER

3

E202

STAND-BY AND UNIT AUXILIARY TRANSFORMER

4

E204

DISTRIBUTION TRANSFORMERS

5

E210

ISOLATED PHASE BUS

6

E218

500kV AND 220kV GAS INSULATED SUBSTATION

7

J211

MAIN CONTROL BOARD AND ASSOCIATED INSTRUMENTS

8

M201

MAIN CONDENSER & AUXILIARIES

9

M202

CONDENSER VACUUM PUMP

10

M204A

MAIN FEEDWATER PUMP

11

M204B

START-UP FEEDWATER PUMP

12

M205

FEEDWATER PUMP TURBINE AND LUBE OIL CONDITIONER

13

M206

AUXILIARY FEEDWATER PUMPS AND DRIVERS

14

M208

CONDENSATE PUMPS AND FEEDWATER BOOSTER PUMPS

15

M220

CIRCULATING WATER PUMPS

16

M227

SAFETY RELATED WATER CHILLERS

17

M228

FEEDWATER HEATERS AND DEAERATOR

18

M246

TURBINE BUILDING CRANE

19

M248

CONTAINMENT POLAR CRANE

20

M250

HOISTS AND MISCELLANEOUS CRANES(LESS THAN 15 TON)

21

M263

CLASS 1E DIESEL GENERATOR

22

N201

ESSENTIAL SERVICE WATER PUMPS AND SCREEN WASH PUMPS

23

N203

CONTAINMENT SPRAY PUMPS

24

N204

ASME III HEAT EXCHANGERS

25

N205

SHOP FABRICATED PRESSURE VESSELS AND TANKS (ASME III)

26

N207

GASEOUS RADWASTE SYSTEM

27

N208

LIQUID RADWASTE SYSTEM

28

N225

LIQUID RADWASTE DEMINERALIZER PACKAGE


© 1999-2024 KEDO. All rights reserved.